• CCR Rule Compliance Data and Information

    Apache Generating Station

  • Closure/Post-Closure
  • Design Criteria
  • Groundwater Monitoring
  • Location Restrictions
  • Operating Criteria
  • Contact Us

Currently browsing Operating Criteria

Document
Date Updated
Category
Annual CCR Fugitive Dust Control Report – 12/18/2020
December 18, 2020
Operating Criteria
​Annual Inspection Report – 01/22/2020
January 22, 2020
Operating Criteria
Annual CCR Fugitive Dust Control Report – 12/16/2019
December 16, 2019
Operating Criteria
​Annual Inspection Report – 04/03/2019
April 11, 2019
Operating Criteria
Annual CCR Fugitive Dust Control Report – 12/14/2018
December 14, 2018
Operating Criteria
2017 Annual CCR Impoundments Inspection Report
April 20, 2018
Operating Criteria
Annual CCR Fugitive Dust Control Report
December 14, 2017
Operating Criteria
Annual Inspection Report
January 18, 2017
Operating Criteria
Annual CCR Fugitive Dust Control Report
December 19, 2016
Operating Criteria
Inflow Design Flood Control System Plan
October 10, 2016
Operating Criteria
  • 1
  • 2
  • »
Categories
  • Closure/Post-Closure
  • Design Criteria
  • Groundwater Monitoring
  • Location Restrictions
  • Operating Criteria