• CCR Rule Compliance Data and Information

    Apache Generating Station

  • Closure/Post-Closure
  • Design Criteria
  • Groundwater Monitoring
  • Location Restrictions
  • Operating Criteria
  • Contact Us

Annual Inspection Report – 01/15/2021

Posted on February 9, 2021 at 8:45 am.

Written by Arizona GT Cooperatives

Download a Printable PDF Copy

Categories
  • Closure/Post-Closure
  • Design Criteria
  • Groundwater Monitoring
  • Location Restrictions
  • Operating Criteria