• CCR Rule Compliance Data and Information

    Apache Generating Station

  • Closure/Post-Closure
  • Design Criteria
  • Groundwater Monitoring
  • Location Restrictions
  • Operating Criteria
  • Contact Us

Annual Inspection Report

Posted on January 18, 2017 at 11:41 pm.

Written by Arizona GT Cooperatives

Download a Printable PDF Copy

Categories
  • Closure/Post-Closure
  • Design Criteria
  • Groundwater Monitoring
  • Location Restrictions
  • Operating Criteria