• CCR Rule Compliance Data and Information

    Apache Generating Station

  • Closure/Post-Closure
  • Design Criteria
  • Groundwater Monitoring
  • Location Restrictions
  • Operating Criteria
  • Contact Us

Y22 Ash Disposal Pond Cells 3 and 4

Posted on October 11, 2016 at 8:50 pm.

Written by Arizona GT Cooperatives

Download a Printable PDF Copy

Categories
  • Closure/Post-Closure
  • Design Criteria
  • Groundwater Monitoring
  • Location Restrictions
  • Operating Criteria