• CCR Rule Compliance Data and Information

    Apache Generating Station

  • Closure/Post-Closure
  • Design Criteria
  • Groundwater Monitoring
  • Location Restrictions
  • Operating Criteria
  • Contact Us

Monitoring well, piezometer, instruments, sampling &; analytical devices document – 12/31/2016

Posted on October 19, 2017 at 3:30 am.

Written by Arizona GT Cooperatives

Download a Printable PDF Copy

Categories
  • Closure/Post-Closure
  • Design Criteria
  • Groundwater Monitoring
  • Location Restrictions
  • Operating Criteria