• CCR Rule Compliance Data and Information

    Apache Generating Station

  • Closure/Post-Closure
  • Design Criteria
  • Groundwater Monitoring
  • Location Restrictions
  • Operating Criteria
  • Contact Us

Annual CCR Impoundment Inspection Report – 1/14/2025

Posted on February 13, 2025 at 8:00 am.

Written by Michael Way

Download a Printable PDF Copy

Categories
  • Closure/Post-Closure
  • Design Criteria
  • Groundwater Monitoring
  • Location Restrictions
  • Operating Criteria